Surveying - Irrigation Sector

Canal/River front/Dame/ catchment area - More than 110 KM and 5000 Hectare.

Darvywati River

Darvywati river rejuvenation project Jaipur. Ch-0.0 KM to Ch-47.5 KM for TPL-SUCG consortium. 110.0 Km (Included Out fall Location survey)

Dams - Darvywati River

Dam detail engineering survey for Darvywati river rejuvenation project. Majar Dam, Ambabari Dam, Gulaar Dam,Ramchandrapura Dam. For TPL-SUCG consortium.

Cadastral Survey

Cadastral Survey for Darvyvati River project area. From Ch- 0.00 to Ch-47.0 K.M for TPL-SUCG consortium.

Projects List

No. Project Name Work Area/Length File
1. Darvywati River Darvywati river rejuvenation project Jaipur. Ch-0.0 KM to Ch-47.5 KM for TPL-SUCG consortium. (Included Out fall Location survey) 110.0 Km. Download
2. Darvaywati River- Topographical Survey Darvaywati River catchment area detail topographical survey work. Both side 500.0m.from Ch-0.0 to Ch-47.5 KM for TPL-SUCG consortium. 4700.00 Hectare Download
3. Majar Dam, Ambabari Dam, Gulaar Dam,Ramchandrapura Dam Dam detail engineering survey for Darvywati river rejuvenation project. Majar Dam, Ambabari Dam, Gulaar Dam,Ramchandrapura Dam. For TPL-SUCG consortium. --- ---
4. Cadastral Survey Cadastral Survey for Darvyvati River project area. From Ch- 0.00 to Ch-47.0 K.M for TPL-SUCG consortium. --- ---

Looking an Adequate Solution for your Company?

Contact us today for free conslutaion or more information.

Get In Touch